Laserfiche WebLink
• 2.05.6(3 ) <br /> The results of the above water monitoring <br /> program will be compared to the baseline information to determine <br /> if the operation is having any adverse impact on the quantity or <br /> quality of the ground water or surface water in or adjacent to the <br /> permit area. <br /> In accordance with Rule 4 .05. 13 (4 ) , an annual <br /> hydrologic report will be prepared and submitted to the Division by <br /> March 15th of each year. The report will contain all monitoring <br /> data, including laboratory analytical reports, for the previous <br /> year. <br /> (v) If the results of the above monitoring plan <br /> indicate that the operation is impacting the water resources in the <br /> area then a mitigation plan will be developed. <br /> (vi) The location of each water collection ditch and <br /> sedimentation pond is shown on the Sedimentation Control Map, <br /> Drawing No. 117 . <br /> (vii) As stated in 2 .04 .7 ( l) , there is no recharge <br /> source to the aquifer in or adjacent to the permit area. <br /> (viii) Not applicable. <br /> • <br /> • <br /> 2 .05-36 April 1993 <br />