My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-01-13_REVISION - C1991078
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
1994-01-13_REVISION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 7:34:06 PM
Creation date
12/21/2009 1:38:57 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Revision
Doc Date
1/13/1994
Doc Name
Letter, Application & Public Notice
From
J.E. Stover & Associates
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2 .05.3 (3 ) (c) <br /> Haul Road <br /> Mining Area 3 requires one haul road to connect the <br /> new mining area with the existing haul. The new haul road will <br /> connect with the existing haul road between mining areas 1 and 2 . <br /> This haul road is approximately 2500 feet long. It is designed to <br /> be 30 feet wide. The haul road has a maximum pitch grade of 15% <br /> which extends for approximately 250 feet. The typical grade of the <br /> haul road is 4%. <br /> Topsoil will be salvaged from a 50-foot wide <br /> corridor along the alignment of the haul road prior to the start of <br /> construction of the road. In cut and fill sections the striping <br /> width will be increased appropriately. Borrow ditches typically <br /> two feet deep and eight feet wide will be excavated on each side of <br /> the road surface to provide material for the subgrade of road. <br /> Four to six inches aggregate base course will be used to surface <br /> the road. A Colorado State Department of Highways Specification, <br /> Class 3 aggregate will be utilized. A section view of the road is <br /> shown of Drawing No. 131. <br /> Cut and fill slopes will be constructed using 2H: 1V <br /> slopes. The haul road is constructed on grade without any <br /> significant fills. The haul road crosses two drainages. Two <br /> • culverts will be placed under the haul road where it crosses the <br /> drainages at haul road stations 17+50 (CMP #14 ) and 24+75 (CMP <br /> #13 ) . The culvert and borrow ditch sizing calculations are <br /> presented in Exhibit 9 . <br /> To provide erosion control, the borrow ditches and <br /> cut and fill slopes will be seeded. The seed mix used will be that <br /> used to stabilize the topsoil stockpiles or other appropriate seed <br /> mix approved by the Division. Broadcast seeding will be used. <br /> The haul road will be constructed in accordance with <br /> the performance standards under Rule 4 . 03 . 1 (3 ) . <br /> After the haul road is no longer needed for <br /> operations it will closed to vehicular traffic and natural drainage <br /> patterns will be restored. All culverts will be removed. The <br /> roadbed will be ripped, plowed, and scarified. Fill slopes will be <br /> rounded or reduced and shaped to conform the site to adjacent <br /> terrain. Cut slopes will be shaped to blend with the natural <br /> contours . The regraded areas will be covered with topsoil and <br /> revegetated in accordance with section 2 .05 .4 . <br /> • <br /> 2 .05-7ii July 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.