Laserfiche WebLink
C-1981-008 PR-06 <br />Submittal Details <br />21-Dec-2009 <br />Page 2 of 3 <br />Section 2.04.10 - Vegetation Information (DTM) <br />• Map 2.04.10-1- Vegetation Baseline Map <br />Section 2.05.3(3) - Mine Facilities (MPB) <br />Attachment 2.05.3(3)-1- Collection / Diversion Ditches and Culverts - Design <br />Parameters (MPB) <br />• Map 2.05.3(3)-1 - Surface Water Hydrology <br />• Map 2.05.3(3)-1-2 - Post Mine Surface Water Hydrology <br />Attachment 2.05.3(3)-6 - Pond 013 - Engineering and Hydrologic Design (MPB) <br />Attachment 2.05.3(3)-7 - Small Area Exemptions (MPB) <br />Attachment 2.05.3(3)-8 - Road and Structure Agreements and Letter <br />• Map 2.05.3(3)-8 - Mine Roads <br />Attachment 2.05.3(3)-12 -Sediment Pond 012 Engineering Design (MPB) <br />Attachment 2.05.3(3)-14 - Pond 011 As Built Hydrology Calculations (MPB) <br />• Map 2.05.3(3)-14 - Pond 011 Design Details <br />• Map 2.05.3(3)-17 -Pond 011 As-Built <br />Attachment 2.05.3(3)-20 - Pond 015 100-Year 24-Hour Full Containment (MPB) <br />• Map 2.05.3(3)-15 -Pond 015 Incised and Total Containment -100-Year <br />Event <br />Attachment 2.05.3(3)-21- Pond 013 As-Built Hydrology Calculations (MPB) <br />Attachment 2.05.3(3)-22 -Pond 011 En ing? eering and Hydrological Design (MPB) <br />Section 2.05.492)(c) - Backfill and Grading <br />• Map 2.05.4-1 - Existing and Projected Reclamation Contours <br />• Map 2.05.4-1-2 - Western Mining Area Post-Mine Topography and Mining <br />Sequence <br />Section 2.05.4(2)(d) - Topsoil (Redistribution) (DTM) <br />• Map 2.05.4-4 - Postmining Topsoil Replacement <br />Section 2.05.4(2)(e) - Revegetation (DTM) <br />• Map 2.05.4(2)(e)-1 - Irrigated Pasture and Cropland Bond Release <br />• Map 2.05.4(2)(e)-2 - Irrigated Pasture Reference Area