My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-07-01_REVISION - C1991078
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
1992-07-01_REVISION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2021 11:33:30 AM
Creation date
12/21/2009 10:23:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Revision
Doc Date
7/1/1992
Doc Name
Joe Dudash Review Information
Type & Sequence
PR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. RUN-OFF VOLUME - - POND F <br /> PRECIP DIRECT RUN-OFF <br /> ACRES CURVE AMOUNT RUN-OFF VOLUME AF <br /> !z'1• I 94 .2 83 1.6 0.44 3 .43 <br /> 136.7 58 1.6 0. 00 0. 04 <br /> z�3 .g �3 0.9 3 .47 �•55 <br /> TOTAL REQUIRED WATER VOLUME <br /> SEDIMENT VOLUME <br /> USING THE UNIVERSAL SOIL LOSS EQUATION <br /> A = R K L S C P <br /> 3 0. 0 0 <br /> R = rainfall factor 0.21 <br /> K = soil erodibility factor <br /> LS = combined length slope factor 3 . 5% - 2000' 1. 05 <br /> C = cropping management factor <br /> P = erosion control practice factor 0.50 any( <br /> A = sediment,tons/acre/year <br /> 3 . 31 <br /> G' <br /> THREE YEAR SEDIMENT VOLUME ACRE FEET 0.91 <br /> 230.9 Acres 115 #/Cubic Feet <br /> • TOTAL REQUIRED SEDIMENT POND F CAPACITY -- AF 4 . 38 <br /> PEAK FLOW CALCULATIONS <br /> The following peak flow calculations were compiled with <br /> the computer program STORM version 6.21. Details of the <br /> run-off calculations are shown on the following pages. <br /> 10-YR 25-YR <br /> 24 HR 24 HR <br /> Event Event <br /> Area CD-3E 3 .84 14 .80 16 .66 <br /> Area CD-2E 2 .94 .1•85 4 .88 <br /> Area CD-1E 10.21 16.97 <br /> Area CD-1W 4.93 2.63 8.20 <br /> Area Pond F 17.51 <br /> Peak flow for Pond F spillway 62 . 36 9,?. So <br /> Four collection ditches will be constructed to collect <br /> and channel the run-off to sediment pond F. Ditch CD-3E <br /> feeds CD-2E which feeds CD-1E. The peak flow in the <br /> ditches will be as follows: 7yPE T <br /> Ditch CD-3E 3 .84 9.9 Z y.29 <br /> • Ditch CD-2E 6.78 /OXi <br /> Ditch CD-1E 16.99 16• 1'( <br /> Ditch CD-1W 4 .93 z. 6 3 <br /> 9-28 July 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.