My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-05-01_REVISION - C1991078
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
1991-05-01_REVISION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 5:11:06 PM
Creation date
12/21/2009 10:23:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Revision
Doc Date
5/1/1991
Doc Name
Replaced Pages
Type & Sequence
TR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 .05 . 4 ( 2) (b) <br /> Seed and Mulch 80 Acres <br /> It is presented above that the topsoil stockpiles <br /> will cover a total of 46 . 3 acres. It is also likely that at any <br /> given time 30 to 40 acres have been topsoiled but not seeded and <br /> mulched. For a worst case basis assume 80 acres will need to be <br /> seeded and mulched. <br /> Seeding Rate Seeding Rate <br /> #/Acre #/Acre <br /> Indian ricegrass 2.50 Utah Sweetvetch 1 .00 <br /> Blue grama 0 .60 Blue Flax 0. 40 <br /> *Needleandthread 1 .50 Fourwing Saltbush 0.50 <br /> Galleta 2 . 40 Winterfat 0. 50 <br /> Sand Dropseed 0.05 <br /> Totals 9 . 45 <br /> Seed Cost per Acre 189 . 00 <br /> per Mike, Arkansas Valley Seed <br /> Seed and Fertilizer Application 15 .00 <br /> Fertilizer $7 .00 per 50 pounds , 285 #/acre 39 .90 <br /> • Mulch 2 tons per acre @ $60 120.00 <br /> Mulch Application, power mulch 150.00 <br /> Total Seed and Mulch Cost per Acre 513 .90 <br /> USE $525/Acre <br /> Fence <br /> It is assumed that the fence around the reclaimed <br /> area is fairly well caught up with the progression of the mine. <br /> One mile of fence would allow a catch up of 1/4 mile on each side <br /> of the pit in the north south direction and allow the area to be <br /> closed in across the property, about 1/2 mile, in the east west <br /> direction. Assume one mile of three strand barbed wire fence per <br /> mining area at $1 . 50 per foot. <br /> Following is an estimate of the cost to reclaim <br /> the mine at the time, during the five year permit term, when it <br /> is believed the reclamation liability is the greatest. <br /> 2.05-19 July 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.