Laserfiche WebLink
x� <br /> 2 . 05 .6 ( 3 ) <br /> The results of the above water monitoring <br /> program will be compared to the baseline information to determine <br /> if the operation is having any adverse impact on the quantity or <br /> quality of the ground water or surface water in or adjacent to <br /> the permit area. <br /> In accordance with Rule 4 . 05 . 13( 4) , an annual <br /> hydrologic report will be prepared and submitted to the Division <br /> by March 15th of each year. The report will contain all monitor- <br /> ing data, including laboratory analytical reports , for the previ- <br /> ous year. <br /> (v) A hydrologic reclamation plan is not consid- <br /> ered necessary at this time. If the results of the above moni- <br /> toring plan indicate that the operation is impacting the water <br /> resources in the area then a mitigation plan will be developed. <br /> (vi ) The location of each water collection ditch <br /> and sedimentation pond is shown on the Sedimentation Control Map, <br /> Drawing No. 117 . <br /> (vii ) As stated in 2 .04 . 7( 1 ) , there is no recharge <br /> source to the aquifer in or adjacent to the permit area. <br /> (viii ) Not applicable. <br /> 2 .05-36 August 1991 <br />