My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-09-23_REVISION - C1991078
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
1993-09-23_REVISION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 6:17:23 PM
Creation date
12/21/2009 10:23:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Revision
Doc Date
9/23/1993
Doc Name
Cost Estimate & Picture
From
DMG
Type & Sequence
TR3
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05 .4 (2 ) (b) <br /> The following discussion forms the basis for the <br /> following reclamation estimate: <br /> Spoil and Topsoil <br /> It will be assumed that an equipment spread of two <br /> 651E scrapers and one D-9 push cat will be used to haul the spoil <br /> and topsoil. Cycle times and productions are as follows . The <br /> CY/Hour production figure assumes two scrapers, a 50 minute work <br /> hour, a payload of 34 .6 cubic yards of topsoil. The cost per cubic <br /> yard is calculated using an hourly rate of $150 for the D-9 and <br /> $175 for the 651E scrapers . <br /> Load/Dump Haul Return Total CY/Hour <br /> Topsoil Pile 3 1.3 1.8 1.4 3.5 494 <br /> Topsoil Pile 4 1.3 2 .0 1.2 4 .5 384 <br /> From topsoil pile 3 the production from the two <br /> scrapers is 988 (484 X 2 scrapers ) cubic yards per hour. At a <br /> scraper spread cost of $500 .00 per hour the unit cost to rehandle <br /> the topsoil from pile 3 is $0.51 (500/988 ) . Using the same <br /> calculation, the unit cost to rehandle the topsoil from pile 4 is <br /> $0.65 . <br /> • Spoil From Ridges <br /> The method used to move spoil ridges into the <br /> adjacent pits is to push it with a tractor dozer. The maximum push <br /> distance is 450 feet, five pits . The average push distance is 225 <br /> feet. From edition 15 of the Caterpillar performance handbook, it <br /> is estimated that a D-9 can push 450 cubic yards per hour with a <br /> 225 ' push distance. Assuming a D-9 costs $150 per hour, the cost <br /> per cubic yard to move the spoil ridges is $0 . 33. <br /> Reclaim Sediment Pond F <br /> The work required to reclaim the sediment pond is to <br /> simply push the embankment back into the pond and regrade the area <br /> with a track type dozer. It is estimated the pond and associated <br /> collection ditches can be reclaimed in eight hours with a track <br /> type dozer. The cost to reclaim the pond is estimated to be 8 Hrs . <br /> X $150 = $1200. <br /> • <br /> 2 .05-20iii July 1992 <br />
The URL can be used to link to this page
Your browser does not support the video tag.