My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-15_HYDROLOGY - M1981022
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1981022
>
2009-12-15_HYDROLOGY - M1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:44 PM
Creation date
12/21/2009 7:33:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981022
IBM Index Class Name
HYDROLOGY
Doc Date
12/15/2009
Doc Name
Substitute Water Supply Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Sira 'W. Sartori Page 5 <br />G.L. Pit Substitute Water Supply Plan (DRMS# M -81 -022) <br />December, 15 2009 <br />Table I <br />G.L. Pit (DRMS # M -81 -022) <br />MO NTHLY DISTRIBUTION FOR DEPLETION & REPLACEMENT REQUIREMENTS <br />(All Values in Acre -Feet) <br />Note: The transbasin Sand Creek Ditch water is transported over Boulder Ridge in the Wilson <br />Ditch and Stored in Eaton Reservoir. Releases made from Eaton Reservoir travel <br />approximately 50 miles to the mouth of the Poudre Canyon therefore, a 7.8 percent transit <br />loss was included in the total replacement water. <br />Lagged Evaporative <br />Transit <br />Total <br />Depletions including <br />losses from <br />Replacement <br />Month <br />post - pumping <br />Eaton <br />Req u irement. from <br />depletions <br />Reservoir <br />Tri- Districts lease <br />Nov -09 <br />0.33 <br />0.03 <br />0.35 <br />Dec -09 <br />0.36 <br />0.03 <br />0.39 <br />Jan -10 <br />0.43 <br />0.03 <br />0.46 <br />Febr -10 <br />0.59 <br />0.05 <br />0.63 <br />Mar -10 <br />0.75 <br />0.06 <br />0.81 <br />Apr-1 0 <br />0.80 <br />0.06 <br />0.86 <br />May-1 0 <br />0.73 <br />0.06 <br />0.78 <br />Jun -10 <br />0.59 <br />0.05 <br />0.64 <br />Jul -10 <br />0.45 <br />0.04 <br />0.49 <br />Aug-1 0 <br />0.37 <br />0.03 <br />0.40 <br />Sept-1 0 <br />0.38 <br />0.03 <br />0.41 <br />Oct -10 <br />0.39 <br />0.03 <br />0.42 <br />Total <br />6.2 <br />0.5 <br />6.7 <br />Note: The transbasin Sand Creek Ditch water is transported over Boulder Ridge in the Wilson <br />Ditch and Stored in Eaton Reservoir. Releases made from Eaton Reservoir travel <br />approximately 50 miles to the mouth of the Poudre Canyon therefore, a 7.8 percent transit <br />loss was included in the total replacement water. <br />
The URL can be used to link to this page
Your browser does not support the video tag.