My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-15_HYDROLOGY - M1981022
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1981022
>
2009-12-15_HYDROLOGY - M1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:44 PM
Creation date
12/21/2009 7:33:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981022
IBM Index Class Name
HYDROLOGY
Doc Date
12/15/2009
Doc Name
Substitute Water Supply Plan
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Sira W. Sartori Page 3 <br />G.L. Pit Substitute Water Supply Plan (DRMS# M -81 -022) <br />December, 15 2009 <br />water may be used must first be approved by this office. <br />5. All releases of replacement water must be sufficient to cover all out -of- priority depletions in <br />time, place,. and amount and must be made under the direction and /or the approval of the <br />water commissioner. The release of replacement water may be aggregated to maximize <br />beneficial use. The water commissioner and /or the division engineer shall determine the rate <br />and timing of an aggregated release. <br />6. The replacement water that is the subject of this plan cannot be sold or leased to any other <br />entity. As a condition of subsequent renewals of this substitute water supply plan, the <br />replacement water must be appurtenant to this site until the groundwater pond has been <br />completely backfilled and the lagged depletions to the stream system have ceased. A copy <br />of this approval letter should be recorded with the county clerk and recorder. All <br />replacement water must be concurrent with depletions in quantity, timing and locations. <br />7. The name, address, and phone number of the contact person who will be responsible for the <br />operation and accounting of this plan must be provided on the accounting forms submitted to <br />the division engineer and the water commissioner. <br />8. Adequate accounting of depletions and replacement must be provided to the division <br />engineer in Greeley and the water commissioner on a monthly basis or other interval <br />acceptable to both of them. The accounting form provided with your application is subject to <br />modification and approval by the division engineer. All amounts shall be in acre -feet. <br />9. This substitute water supply plan may be revoked or modified at any time should it be <br />determined,that injury to other vested water rights has or will occur as a result of this plan. <br />10. Connell Resource, Inc. has amended their DRMS permit to account for the gradual <br />backfilling of the site. Replacement of lagged depletions must continue until there is no <br />longer an effect on stream flow. Approval of this substitute water supply plan does not <br />relieve the Applicant and /or the landowner of the requirement to obtain a water court decree <br />approving a permanent plan for augmentation or mitigation to ensure the permanent <br />replacement of all depletions, including long -term evaporation losses and lagged depletions <br />after gravel mining has ceased. Renewal of this plan is contingent on the Applicant <br />demonstrating that the backfilling of the site has continued or contingent upon the <br />Applicant filing an application for a plan for augmentation with the Division 1 Water <br />Court that includes long -term evaporation losses at the G. L. Pit site. <br />10. To assure that depletions from groundwater evaporation do not occur in the unforeseen <br />event, or events, that would lead to the abandonment of the pit, a bond for $148,500.00 <br />through DRMS for lining or backfilling of the pit has been obtained. Therefore, in case of <br />abandonment the bond can finance the completion of the lining of the pit or the backfilling, <br />thus preventing depletions to the stream system. <br />11. In accordance with amendments to §25 -8- 202(7), C.R.S., and "Senate Bill 89 -181 Rules and <br />Regulations" adopted on February 4, 1992, the State Engineer shall determine whether the <br />substitute supply is of a quality to meet requirements of use to senior appropriators. As <br />such, water quality data or analysis may be requested at any time to determine if the water <br />quality is appropriate for downstream water users. <br />
The URL can be used to link to this page
Your browser does not support the video tag.