Laserfiche WebLink
~ III fII'll'lII'll'll Doc Date:1211112001 <br />"~~ 2.05,2 OPERATION PLAN - ESTIMATED AREA FOR LIFE OF OPERATION <br />(1) Production Methods and Equipment .~f <br />The mining method to be employed is open pit strip mining. <br />Wheel scrapers and track dozers or other rubber tired or tracked <br />equipment will be used to handle topsoil and overburden material. The <br />overburden material will require blasting. The overburden from the <br />first pits along the outcrops will be temporarily placed off the coal. <br />Overburden excavated from subsequent pits will be placed in adjacent <br />mined out pits. The topsoil from approximately the first five to <br />seven pits will be stripped and placed in a stockpile. Topsoil <br />excavated from subsequent pits will be placed on backfilled and <br />regraded pits to accomplish contemporaneous reclamation. Where <br />possible and economically feasible the topsoil will be stockpiled near <br />the site of the final pit opening for use in final pit closure. <br />Coal will be loaded into highway type trucks with a rubber <br />tired front end loader or other comparable loading equipment. The <br />coal haulage trucks will transport the coal from the mine to the coal <br />consumer via the county road to the south of the area to be mined. <br />Up to sixty loaded coal trucks will travel the road each day. <br />Up to 480,000 tons per year will be mined from the area. <br />Assuming a 20 year mine life, 9,600,000 tons will be mined over the <br />life of the operation. A 5-foot thick coal seam contains <br />• approximately 7,500 tons per acre of recoverable coal. This means <br />that about 1,280 acres of coal will actually be mined during the 20 <br />year mine life. All economically recoverable coal will be mined from <br />the approved mining areas. Economically recoverable coal is coal that <br />can be mined and sold at a profit. General guidelines used by the <br />industry to identify economically recoverable coal include stripping <br />ratios less than 10:1 and individual coal seam thicknesses greater <br />than 10 inches. <br />(2) Operation Description <br />The first five year permit area will include mining in the <br />w/2 of Section 32 and the NW/4 of Section 4. The second five year <br />permit area will complete mining in the area explained above and begin <br />mining in the E/2 of Section 32. Because of coal quality <br />considerations the mining in the E/2 of Section 32 may occur during <br />the first five year permit term. <br />The operation plan for the estimated area for the life of <br />the operation is shown on The General Mine Plan Map, Drawing No. 114. <br />This plan is presented to show, in general concept, where the <br />applicant believes the mine, in years 6 through 20, will be <br />developed. Coal exploration data for these areas is sketchy to <br />nonexistent so this long range plan is really just a best guess. Coal <br />market factors also impact long range plans. <br />• <br />2.05-1 July 1992 <br />