Laserfiche WebLink
DEPARTMENT OF NATURAL RESOURCES <br />IYIG(!, <br />DIVISION OF WATER RESOURCES <br />Bill Ritter, Jr. <br />December 14, 2009 Governor <br />James B. Martin <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />Ms. Michelle L. Hatcher <br />Clear Water Solutions 4 -10 <br />8010 S. Country Road 5, Ste. 105 <br />Windsor, CO 80528 <br />RE: Substitute Water Supply Plan, NCCI Pit #1, M- 2001 -107 (WDID 0202566) <br />Section 24, T2N, R67W, a P.M. <br />Water Division 1, Water District 2, Weld County 1'Ui3. <br />Approval period: January 1, 2010 through December 31, 2010 ( 14- 2009 <br />Contact phone number for Ms. Michelle L. Hatcher. 970 - 223 -3706 <br />Dear Ms. Hatcher: <br />We have received your letter of October 30, 2009, requesting renew of the above referenced <br />substitute water supply plan to cover depletions caused by an existing gravel mining operation operated by <br />Northern Colorado Constructors, Inc. ( "Applicant'). The required fee of $257.00 for the renewal of this <br />substitute supply plan ( "SWSP ") has been submitted (receipt no. 3643266). The original supply plan was <br />approved on December 30, 2002 and the SWSP was most recently renewed on November 12, 2008. <br />Plan Operation <br />This plan seeks to replace depletions resulting from mining at the NCCI Pit #1 ( "NCCI Pit" — <br />WDID 0203016). There will be a dewatering trench around the active mining cell. Water from the <br />trench will be collected in a process water pond then pumped. to a sedimentation pond. After <br />sedimentation, the water will be returned to Little Dry Creek where it will flow back to the South Platte <br />River. In addition, the dewatering trench will include two 20 ft x 300 ft and two 20 ft x 200 ft ponds; <br />another 100 ft x 200 ft pond will be used for process water for the concrete plant. The total exposed <br />water surface at the site is 2.73 acres. <br />In order to provide a buffer to neighboring wells from dewatering, the Applicant constructed two <br />recharge ditches on the southern end of the property. The Applicant will place a portion of its <br />dewatering water into these recharge ditches. <br />During the period of this SWSP, depletions at the site will result from evaporation, water lost in <br />mined product, and dust control. The Applicant does not anticipate using any water for the production of <br />concrete and asphalt during the requested plan period. The lagged depletions will be replaced using <br />fully consumable effluent leased from the City of Thornton ( "Thornton "). <br />The reclamation plan for the NCCI Pit is to place a compacted clay liner around the interior of <br />the mine slopes for the purpose of preventing groundwater seepage from entering the pit. The applicant <br />has bonded for lining of the pit through the Colorado Division of Reclamation Mining & Safety. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />www.water.state.co.us <br />