My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-11_GENERAL DOCUMENTS - C1980001
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980001
>
2009-12-11_GENERAL DOCUMENTS - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:36 PM
Creation date
12/15/2009 2:58:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
12/11/2009
Doc Name
Proposed Decision & Findings of Compliance for SL10
From
Phase I/II/III 13.3 acres
Permit Index Doc Type
Findings
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%A <br />& Today once weekly for four consecutive weeks, beginning on December 7, 2008. Chevron <br />Mining Inc., also notified landowners within and adjacent to the mine permit area, and other <br />interested parties of the application for bond release, as required by section 3.03.2(1). The <br />Division received one written objection regarding the bond release application. The written <br />objection was received by the Division on June 09, 2009 in a letter written and submitted by <br />the Natural Resources Conservation Service (MRCS) in Steamboat Springs, Colorado. In a <br />letter dated August 20, 2009, the Division provided responses to the concerns raised in the <br />NRCS objection letter. The Division received no other comments, objections, or requests for <br />informal conferences in regarding this bond release application. <br />Bond Release Inspection <br />The Division scheduled and conducted a bond release inspection on July 20, 2009. The site <br />inspection was conducted in accordance with Section 3.03:201_ Jason Musick and Janet <br />Binns represented the Colorado Division of Reclamation, Mining, and Safety. The operator <br />was represented by Steven Leach of Chevron Mining, Inc and Troy Summers of WWC <br />Engineering. Christine Belka represented the United States Office of Surface Mining. Lori <br />Jazwick represented the Natural Resources Conservation Service and Sarah Hagenbach <br />represented the Routt County Conservation District. Tom and Leslie Maneotis, Rob and <br />Kathryn Dick were the landowners present at the inspection. Asset manager Scott Hayden <br />represented the land ownership group, Hoeptner et al Land. It was determined during this <br />initial inspection that small maintenance items and slight weed management was required. <br />The Division's inspection report is on file at the Denver Office of the Division of <br />Reclamation, Mining and Safety. <br />The Division conducted a second inspection on August 24, 2009 to ensure maintenance items <br />noted during the July 20th inspection had been adequately addressed. Jason Musick and Janet <br />Binns represented the Division. The operator was represented by Steven Leach of Chevron <br />Mining, Inc. Christine Belka represented the United States Office of Surface Mining. <br />Christine Ship represented Natural Resources Conservation Service and Sarah Hagenbach <br />represented the Routt County Conservation District. Tom Maneotis and John and Terry <br />Redd were the landowners present at the inspection. Asset manager Scott Hayden <br />represented the land ownership group, Hoeptner et al Land. The Division's inspection report <br />is on file at the Denver Office of the Division of Reclamation, Mining and Safety. <br />III. CRITERIA FOR BOND RELEASE <br />Phase I Bond Release <br />Section 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall <br />be released when the permittee successfully completes backfilling, regrading, and <br />drainage control in accordance with the approved reclamation plan." <br />Phase II Bond Release <br />Section 3.03.1(2)(b) states, "Up to eighty-five percent of the applicable bond amount shall be <br />Edna Mine Page 6 December 11, 2009 <br />Phase I, II, and III Bond Release
The URL can be used to link to this page
Your browser does not support the video tag.