My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-14_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2009-12-14_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:43 PM
Creation date
12/15/2009 10:28:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
12/14/2009
Doc Name
Cost Estimate (Emailed)
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
TR64
Email Name
MLT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk Creek Mine C-1981-022 <br />Technical Revision 64 <br />PROJECT IDENTIFICATION <br />Date : 14-Dec-09 Permit C-1981-022 Site: Elk Creek Mine <br />User: JRS State : Colorado <br /> Filename: C022-220 County: Delta <br />Agency Name: Colorado Division Of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 64 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />211 Plug and Seal Three Gob Vent Boreholes 48.00 $30,562 <br />212 Regrade Three Drill Pads 14.47 $2,916 <br />213 Regrade Light-Use Roads 6.36 $1,283 <br />214 Replace Topsoil from Stockpile to Three Drill Pads 7.37 $1,486 <br />215 Replace Topsoil from Stockpile to Light-Use Roads 3.23 $652 <br />216 Reseed Three Drill Pads 3.00 $1,252 <br />217 Reseed Light-Use Roads 1.80 $751 <br /> <br /> Direct Cost Total 84.23 $38,902 <br /> <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (2.02% of Direct Costs) $786 <br /> Performance Bond (1.05% of Direct Costs) $408 <br /> Job Superintendent (at $52.10/hour) 42.12 $2,194 <br /> Profit (10.00% of Direct Costs) $3,890 <br /> <br /> Total Overhead and Profit $7,279 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $46,181 <br /> <br /> <br /> Le ag 1- En ing eering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $1,963 <br /> Reclamation Management and Administration (3.25% of Contract) $1,501 <br /> <br /> TOTAL BOND AMOUNT $49,644 <br />jrs Page 1 14-12-09
The URL can be used to link to this page
Your browser does not support the video tag.