My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-09_PERMIT FILE - M2009079
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009079
>
2009-12-09_PERMIT FILE - M2009079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:32 PM
Creation date
12/15/2009 8:18:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009079
IBM Index Class Name
PERMIT FILE
Doc Date
12/9/2009
Doc Name
Response letter dated 12/07/2009
From
Baseline Corporation
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel 2 <br />PerPit Response Letter to State 12- 7 -09.doc <br />Rule 3.1.9(1) Topsoil: Please confirm that any topsoil /overburden left in place for more than 180 <br />days or one growing season will be protected from wind and water erosion with the temporary <br />seed cover proposed in the reclamation plan. <br />Response: The operator agrees and this condition has been added to Exhibit E. <br />Rule 3. 1.10 Revegetation: <br />(1) While it is understood that natural grasses and shrubs are limited on site, it appears the seed <br />mix proposed is not diverse. Two bromes and two wheat grasses are proposed. A nitrogen <br />fixer such as Cicer milkvetch and another grass such as Sheep Fescue should be added to the <br />mix to improve reclamation success. <br />Response: The seed mix has been updated within Exhibit E. <br />(2) Please commit to ensuring no livestock will be permitted on site until the permit or area is <br />released by DRMS. <br />Response: The operator commits to this condition which has been added to Exhibit E. <br />6.4.7 - Exhibit G Water information is adequate. Please note response by the applicant to comments from <br />DWR are still pending. <br />Response: A copy of the response letter to DWR was sent to you on Dec. 3rd. <br />6.4.8- Exhibit H Wildlife. Please note response by the applicant to comments from DOW are still pending. <br />Response: A copy of the response letter to DOW was sent to you on Dec. 3rd. <br />6.4.19- Exhibit S, Permanent Man -Made structures need to identify two culverts on County Road 21. <br />Response: Exhibit S has been revised to this affect. <br />Rule 6.5: Geotechnical Stability Exhibit appears to be adequate. Please note in Mining Plan <br />recommendations will be followed. <br />Response: Exhibit D, Mining Plan has been updated with this note. <br />Please let us know if you have any further questions or concerns. <br />Sincerely, <br />CAis Awrd"Al <br />Chris Rundall, PE <br />Division :Manager <br />Cc: Dave Zehner, Precision Excavating <br />
The URL can be used to link to this page
Your browser does not support the video tag.