Laserfiche WebLink
CIRCES Cost Estimating Softw <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFI ATION <br />Task # : 04a State : Colorado Permit/job # : -1999 -025 <br />Abbreviation : none <br />Date : 1210912009 County : Mesa <br />User : THM Site Soaring Eagle Gravel Pit Filename : MO25 -04a <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Alternate methods Seismic: NA NA <br />Area : 32.00 acres <br />Utilization <br />$45.82 NA <br />$53. 100 <br />$4.53 100 <br />$38.54 NA <br />$142.04 Total fleet cost/hour : $ 284.08 <br />Selected estimating method <br />Load factor: NA Bank volume <br />Rip depth (ft) : 2.00 Volume <br />Source of estimated quantity :29 acre facilities, 2 acre pit slope, 1 acre island <br />Source of estimated load factor: NA <br />HOURLY PRODUCTION <br />Area <br />NA BCY <br />103,253 BCY or CCY <br />Alternate methods - <br />Seismic: Seismic velocity: <br />NA <br />feet/second <br />Unadjusted production <br />2,435.08 <br />cu. yds. /hour <br />Unadjusted production : <br />NA <br />cu. yds. /hour <br />per selected method : <br />Area : Avg. ripping depth : <br />2.00 <br />feet/pass <br />Site altitude : <br />4,500 <br />1.00 <br />feet <br />(Cat HB) <br />Average ripping width : <br />6.50 <br />feet/pass <br />Altitude adjustment: <br />0.83 <br />(1 sh ift/day) <br />Average ripping length : <br />500.00 <br />feet/pass <br />Job efficiency factor: <br />0.83 <br />multiplier <br />Average dozer speed : <br />88.00 <br />feet/minute <br />Net job correction : <br />Average maneuver time : ---- 6,25 <br />0.755 <br />minutes /pass <br />acres /hour <br />Adjusted unit production : <br />2,021.12 <br />cu. yds. /hour <br />Production per unit area : <br />Unadjusted production : <br />2,435.08 <br />cu. yds. /hour <br />Adjusted fleet production <br />4,042.23 <br />cu yds. /hour <br />JOB TIME AND COST <br />2 <br />dozer(s) <br />Total job time : <br />25.54 <br />hours <br />Fleet size: <br />Unit cost: <br />per cu. yd. <br />Total job cost: <br />$7,257 <br />