Laserfiche WebLink
Transportation Cycle Time: <br />Non - <br />Roadable <br />Equipment <br />Haul time (hours) = <br />0.14 <br />Return time (hours) = <br />0.14 <br />Loading time (hours) = <br />0.50 <br />Unloading time (hours) = <br />0.50 <br />Subtotals = <br />1.29 <br />JOB TIME AND COST <br />sheet 2 of 2 <br />Nearest major city or town within project area region : Grand Junction <br />Total one -way travel distance : 5.0 miles <br />Roadable Average travel speed : 35.0 mph <br />0.14 <br />0.14 <br />NA <br />NA <br />0.29 <br />Total non - roadable mob /demob cost " <br />* two round trips with haul rig <br />Total roadable mob /demob cost " <br />** one round trip, no haul rig <br />Total job time <br />Total job cost <br />$4,507.72 <br />$0.00 <br />Y.57 hours <br />EQUIPMENT HAUL DISTANCE and TIMt <br />