Laserfiche WebLink
CIRCES Cost Estimatina Softw <br />erroeDGR - [1M Y WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name DRMS <br />Task # : 07a <br />State : C olora d o Permit/job # : M -1999 -025 <br />Count Mesa Abbreviation : none <br />Date : 1210912009 y � Filename : MO25 -07a <br />User : THM Site: Soaring Eagle <br />Permit or other job action :Final Reclamation Cost Estimate Update <br />Task description :Apply top soil to 4500 LF of pit slope <br />HOURLY EQUIPMENT COST <br />Model: Cat 633E Series 2 <br />Shift basis: 1 per day <br />Source of quantity take -off :4500 LF x 20' W covered with 7" of <br />Source of estimated swell factor: NA <br />HOURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weigh_, <br />Material weight: 1,600 pounds /LCY <br />Material description : <br />Top Soil <br />Rated payload : 82,000 pounds <br />Payload capacity: 51.25 LCY <br />Struck volume : [J.tv LV <br />Heaped volume: 34.00 LCY <br />Average volume: 28.60 LCY <br />Adjusted capacity : 28.60 LCY * ** <br />Loading time: <br />Job utilization % <br />Horsepower 490 <br />Cost Breakdown: <br />Maneuver and spreading time : <br />NA <br />Weight (UST): 56.34 <br />Ownership cost/hour : <br />$80.67 <br />100 <br />Cost data source : (CRG) <br />Operating cost/hour : <br />$124.44 <br />Total res.( %) Velocity (fpm) <br />Travel time (min.) <br />Operator cost/hour : <br />$38.72 <br />NA <br />5.0 1,375 <br />Total unit cost/hour : <br />$ 243.82 <br />Total fleet cost/hour <br />$243.82 <br />MATERIAL QUANTITIES <br />0.39 <br />Loose <br />Return : 900 <br />Initial <br />Swell <br />factor <br />: NA volume: <br />1 ,943 LCY <br />volume: 1,943 LCY <br />2.79 <br />minutes <br />Source of quantity take -off :4500 LF x 20' W covered with 7" of <br />Source of estimated swell factor: NA <br />HOURLY PRODUCTION <br />Hauling Capacity: <br />Scraper Payload (weigh_, <br />Material weight: 1,600 pounds /LCY <br />Material description : <br />Top Soil <br />Rated payload : 82,000 pounds <br />Payload capacity: 51.25 LCY <br />Struck volume : [J.tv LV <br />Heaped volume: 34.00 LCY <br />Average volume: 28.60 LCY <br />Adjusted capacity : 28.60 LCY * ** <br />R.cic <br />Scraper Bo wl (volume) Basis, <br />Loading time: <br />0.90 <br />minutes <br />Cycle Time (load + haul + spread + ret urn) <br />Maneuver and spreading time : <br />0.70 <br />minutes <br />loading time per pair on push -pull models <br />Travel time: <br />Distance (feet) <br />Grade ( %) Roll. res.( %) <br />Total res.( %) Velocity (fpm) <br />Travel time (min.) <br />** <br />Route <br />5.0 <br />5.0 1,375 <br />0.80 <br />minutes <br />Haul : 900 <br />0.0 <br />5.0 2 288 <br />0.39 <br />minutes ** <br />Return : 900 <br />0.0 5.0 <br />"travel time adjusted for acceleration and deceleration at load and dump points <br />2.79 <br />minutes <br />velocities are max. attainable per total resistance shown, not average <br />Total cycle time <br />Job Condition Correction Factors <br />Adjusted Hourly Production ; <br />Site altitude (feet) : _4,500 <br />1.00 (Cat HB) <br />Unadjusted unit production <br />: 614.76 <br />LCY /Hour *'* <br />Altitude adjustment factor: <br />(1 shift /day) <br />Adjusted unit production <br />: 510.25 <br />LCY /Hour <br />Job efficiency factor : 0.83 <br />Adjusted fleet production <br />: 510.25 <br />LCY /Hour <br />.• _ — -._- . n oQ <br />"` 2 times volume on push -pull models <br />I., . : ,,. <br />R.cic <br />Scraper Bo wl (volume) Basis, <br />