My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-10_INSPECTION - M1999025
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999025
>
2008-12-10_INSPECTION - M1999025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:46 PM
Creation date
12/15/2009 8:18:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999025
IBM Index Class Name
INSPECTION
Doc Date
12/10/2008
Doc Name
Reclamation cost update
From
DRMS
To
Grand Junction Pipe and Supply Company
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Softw <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 05a <br />Date : 1210912009 <br />User: THM <br />State : Colorado Permit/job# : M- 1999 -025 <br />County : Mesa Abbreviation : none <br />Site oaring Eagle Gravel Pit Filename : MO25 -05a <br />Agency or organization name DRMS <br />Permit or other job action :Final Reclamation Cost Estimate Update <br />Task description :Excavate Outlet Structure <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D7R DS Series 11- 7SU Horsepower : 240 <br />Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : <br />Data source : (CRG) <br />Cost Breakdown: Ownership cost/hour : <br />Operating cost/hour : <br />Ripper op. cost/hour : <br />Operator cost/hour <br />Total unit cost/hour <br />Utilization <br />$40.93 NA <br />$53.15 100 <br />$0.00 NA <br />$38.54 NA <br />$132.61 Total fleet cost/hour : $ 132.61 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,555 BCY <br />factor : 1.180 volume: 3,015 LCY <br />Source of estimated volume :Outlet Specifications <br />Source of estimated swell factor CAT Handbook <br />HOURLY PRODUCTION <br />Average push distance : 75 feet <br />Unadjusted hourly production : 8541 LCY /hr <br />Material consistency description <br />(;rmnacted fill or embankment <br />Average push gradient: 0.00 % ( <br />Average site altitude : 4,500 feet <br />Material weight <br />Weight description : <br />Clay and gravel - Wet <br />2,600 Ibs /LCY <br />Job Condition Correction Factors <br />aowc;c <br />Operator skill : <br />0.75 <br />(av <br />Material consistency : <br />0.90 <br />(Cat HB) <br />Dozing method : <br />1.00 <br />_ (gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency: <br />0.83 <br />( 1 shift/day) <br />Spoil pile: <br />0.80 <br />(fnd - rf) <br />Push gradient: <br />1.00 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat H B) <br />Material weight: <br />0.88 <br />_ (Cat H B) <br />Blade type: <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.40 <br />Adjusted unit production : <br />338.15 <br />LCY /hr <br />Adjusted fleet production : <br />338.15 <br />LCY /hr <br />
The URL can be used to link to this page
Your browser does not support the video tag.