My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-12-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:23 PM
Creation date
12/15/2009 6:59:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/11/2009
Doc Name
Weekly Construction Quality Assurrance ("CQA") Report: 11/08/09
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: November 14, 2009 <br />Reporting Period: 11/08/09 through 11/14/09 <br />Days <br />S <br />I M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />![!ED <br />D = Day Shift N = Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: 28F to 41 ° F ( + / -) High: 36 °F to 67 ° F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Ames worked until 8:00pm on Wednesday (11/11/2009) to stay ahead of the geomembrane <br />installer. Work activities were paused at approximately 10:00am on Saturday (11/14/2009) due <br />to snow. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />No work performed during the week. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed in between stations E 15 +00 ( + / -) and E 16 +00 ( + / -), <br />approximately 75 to 100 feet right of centerline and between stations H0 +00 ( + / -) and H4 +00 <br />( + / -), approximately 50 feet left of centerline to 50 right of centerline. Contouring was <br />performed using various CAT dozers and CAT excavators. Material generated as the cut <br />progressed was pushed down the slope. <br />VLF Weekly Report WE 11.14.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.