Laserfiche WebLink
N <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M -88 -112 <br />November 2009 Monthly Report <br />Page 2 <br />Table 1- November 2009 Ground Water Monitoring Well and Lysimeter Depth to Water <br />Measurements <br />Monitoring Site <br />Date <br />Depth to Water (feet) <br />M4R <br />11/30/09 <br />0 <br />M -6 <br />11/30/09 <br />D <br />M -7 <br />11/30/09 <br />Dry <br />M -g <br />11/30/09 <br />D <br />M -9 <br />11/30/09 <br />141.44 <br />M -10 <br />11/30/09 <br />26.51 <br />M -1 1R <br />11/30/09 <br />42.34 <br />M -12 <br />11/30/09 <br />177.71 <br />M -13R <br />11/30/09 <br />129.05 <br />M -14 <br />11/30/09 <br />133.68 <br />M -15 <br />11/30/09 <br />89.90 <br />M -16 <br />11/30/09 <br />23.26 <br />M -19 <br />11/30/09 <br />25.25 <br />M -21 <br />11/30/09 <br />19.37 <br />M -22 <br />11/30/09 <br />17.67 <br />M -26 <br />11/30/09 <br />16.69 <br />M -32 <br />11/30/09 <br />43.50 <br />M -33 <br />11/30/09 <br />47.50 <br />M -34 <br />11/30/09 <br />23.93 <br />BF -4 <br />11/30/09 <br />24.83 <br />BF -6 <br />11/30/09 <br />30.86 <br />LS -1 <br />11/25/09 <br />Dry <br />LS -2 <br />11/25/09 <br />D <br />LS -3 <br />11/25/09 <br />D <br />LD -1 <br />11/25/09 <br />D ry <br />LD -2 <br />11/25/09 <br />D <br />LD -3 <br />11/25/09 <br />D <br />Table 2 - November 2009 Tailing Disposal Area Piezometer Depth to Water <br />Piezometer Dale Depth to Water Total Depth (ft) Volume of <br />(feet) Water (ft) <br />P6 <br />11/30/09 <br />Dry <br />72.46 <br />0.00 <br />P7 <br />11/30/09 <br />Dry <br />92.50 <br />0.00 <br />P8 <br />11/30/09 <br />96.81 <br />97.51 <br />0.70 <br />P9 <br />11/30/09 <br />71.83 <br />72.30 <br />0.47 <br />P10 <br />I 11/3Q/09 <br />58.09 <br />1 58.30 <br />10.21 <br />P11 <br />11/30/09 <br />41.34 <br />1 41.80 <br />10.46 <br />