My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-11_REVISION - C1981019 (2)
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-12-11_REVISION - C1981019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:37 PM
Creation date
12/14/2009 9:35:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/11/2009
Doc Name
Preliminary Adequacy Review
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR82
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
well in advance of any topsoil laydown activities taking place. Colowyo has <br />committed to replacing at least the permitted allocation of topsoil to each <br />reclamation unit of either 8 or 19.5 inches depending on the location of the <br />unit. The only exception to this is the Sagebrush Steppe areas which have <br />already been identified. <br />Please clarify and specify the different topsoil replacement zones and their <br />respective replacement depth in the permit text where they are addressed. Please <br />provide this text to the Division for review. <br />Colowyo's Response: <br />Colowyo has agreed to annually provide the Division with substantial information to <br />demonstrate compliance with every reclamation block moving forward as it pertains to <br />variable topsoil depth verification. The language proposed by the Division is not <br />necessary to ensure biologically significant diversity in the depth of topsoil replaced on <br />reclamation units moving forward. <br />2. Based on the discussion of more quantitative topsoil replacement zones in <br />question 1 above, please change the "Generic Cross-Section for Topsoil <br />Replacement Depths Across a Typical Drainage", shown on Page 2.05-46, to <br />conform to these replacement depth zones. Please include a generic cross-section <br />for both the West Pit and the South Taylor Pit, using the pit specific replacement <br />zones in the appropriate cross-section. <br />Colowyo's Response: <br />Colowyo has described in detail how it will re-apply topsoil in the Sagebrush <br />Steppe areas. In addition the "Generic Cross-Section " is meant to apply to all <br />reclamation areas. The topsoil balance of each reclamation unit will depend on whether <br />it is in the "original " permit area (East Pit, West Pit, Section 16, South Facilities) or <br />South Taylor, which will dictate the allocated volume of topsoil to be applied for each <br />reclamation unit. The Division and Colowyo will be able to confirm the volume of topsoil <br />replaced and the depths to which it has been applied through load counts and on the <br />ground verification as defined in the text. Colowyo has agreed to annually provide the <br />Division with substantial information to demonstrate compliance with every reclamation <br />block moving forward as it pertains to variable topsoil depth verification. <br />3. On Page 2.05-46 Colowyo states that "(t)opsoil will then be redistributed to an <br />average or variable replacement depth..." (emphasis added). Since the focus of <br />the topsoil replacement efforts in the West and South Taylor Pits at the Colowyo <br />Mine is now variable topsoil replacement depths to enhance species diversity, the <br />statement regarding "average replacement depth" appears to be contradictory. <br />Please clarify the statement on Page 2.05-46 regarding average topsoil <br />replacement depths.
The URL can be used to link to this page
Your browser does not support the video tag.