Laserfiche WebLink
-4- <br />12. Primarv future (Post mining) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. <br />Cropland(CR) <br />Rangeland(RL) <br />Residential(RS) ( Recreation(RC) <br />Developed WaterResources(WR) <br />Pastureland(PL) <br />Forestry(FR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Area to be mined using front end loaders, dozers and excavators and moved to processing plant <br />15. On Site Processing: ? Crushing/Screening <br />13.1 _ Briefly explain mining method (e.g. truck/shovel): <br />once i the topsoil and overburden are stripped and stockpiled, material will be processed into specific aggregates <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Descriotion of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s).