My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-09_REVISION - M1997064
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997064
>
2009-12-09_REVISION - M1997064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:55:52 PM
Creation date
12/9/2009 10:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997064
IBM Index Class Name
REVISION
Doc Date
12/9/2009
Doc Name
Approved with Conditions
From
DRMS
To
GCC Rio Grande, Inc.
Type & Sequence
CN1
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blade type :Universal <br />Attachment no. 1 :ROPSCab <br />Attachment no. 2:3'ohenk ripper <br />8hiftbnais: /oorday <br />Data source <br />Utilization % <br />Cost Breakdown <br />Ownomhip0000hnur <br />$53.74 <br />NA <br />Opomkingcnot/hour: <br />$ruou <br />Ripper op. cost/hour <br />$2 <br />Operator cost/hour <br />$38 <br />NA <br />Total unit coot/hour: <br />$165.45 Total fleet cost/hour <br />$165.45 <br />MATERIAL QUANTITIES <br />Initial <br />Swell <br />Loose <br />volume: 1.020 <br />CCY factor <br />1.125 volume: <br />1,148 <br />LCY <br />Source of estimated volume: EXHIBIT L <br />Source of estimated swell fador:EXH8]/T <br />HOUR . LY PRODUCTION <br />Job Condition Correction Factors <br />Source <br />Operator skill <br />0.75 <br />(avg.) <br />Average push distance <br />200 feet <br />Material consistency <br />1.00 <br />(Cat HB) <br />Unadjusted hourly production <br />515.8 LCY/hr <br />Dozing method: <br />1.20 <br />(slot) <br />Visibility: <br />1.00 <br />(avg.) <br />Material consistency description <br />Job efficiency: <br />0.83 <br />Tshiftlday) <br />Consolidated stockpile <br />Spoil pile: <br />0.80 <br />(fnd-r� <br />Push gradient: <br />1.05 <br />(Cat HB) <br />Average push gradient <br />2.00 % (neg) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Average site altitude <br />5,432 feet <br />Material weight: <br />0.90 <br />(Cat HB) <br />Blade type <br />1.00 <br />(S/SU/U) <br />Material weight: <br />2,550 Ibs/LCY <br />Net correction <br />0.56 <br />Weight description <br />Earth - packed <br />Adjusted unit production <br />290.79 <br />LCY/hr <br />Adjusted fleet production <br />290.79 <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size <br />/ Dozer(s) <br />To job time <br />3'95 <br />Hours <br />Unit cost <br />$0.569 /LCY <br />Total job cost <br />$653 <br />
The URL can be used to link to this page
Your browser does not support the video tag.