My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-08_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-12-08_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:31 PM
Creation date
12/8/2009 2:10:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/8/2009
Doc Name
Comments & Responses Response to DRMS Incompleteness Letter
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR81
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: Please see the response to Comment 7 above. Additional text for <br />Section 2.05.3(6) has also been added with this submittal. <br />9. With the submittal of Technical Revision 81, Colowyo is proposing to revise <br />the volume and configuration the West Taylor Fill. The currently approved capacity <br />for the fill is 10 million cubic yards. Colowyo proposes to increase the capacity of <br />the West Taylor Fill to approximately 50 million cubic yards. This change will result <br />in a substantial change to the volume and configuration of the permanent fill. <br />Colowyo has not provided any designs (besides the new Map 45), engineering <br />reports or geotechnical stability analyses of the proposed fill volume and <br />configuration. Please provide the Division with designs, engineering reports <br />and geotechnical stability analyses for the proposed volume and configuration <br />of the West Taylor Fill. <br />Response: Please see the response to Comment 7 above. <br />10. In addition to using the East Taylor Fill as a temporary overburden stockpile, <br />Colowyo is now proposing to use the West Taylor Fill for a temporary overburden <br />stockpile as well. The proposed plan to use the West Taylor Fill for stockpiling <br />overburden material is new. Colowyo has not provided any information regarding <br />the volume of spoil that will be temporarily stockpiled on the West Taylor Fill. <br />Additionally, Colowyo has not provided any designs or details regarding the <br />construction of this temporary overburden stockpile (besides new Map 45). Finally, <br />Colowyo has not provided any engineering reports or geotechnical stability analyses <br />for the temporary overburden stockpile or any reports verifying the long-term stability <br />of the West Taylor Fill with the additional overburden material stockpiled on it. <br />Please provide the Division with the volume of spoil planned for the temporary <br />overburden stockpile, detailed designs and construction information and <br />engineering reports and geotechnical stability analyses of the temporary <br />overburden stockpile and the West Taylor Fill. In addition, Please update the <br />text regarding this temporary overburden stockpile in Section 2.05.3(6) of <br />Volume 12 and Maps 35A and 40A. <br />Response: Please see the response to Comment 7 above. Additional text for <br />Section 2.05.3(6) has also been added with this submittal. <br />11. In the plan initially submitted as a part of Permit Revision 02, Colowyo <br />planned on temporarily stockpiling approximately 30 million yards of spoil on the <br />East Taylor Fill (TS West 1 and TS West 2) and stockpiling approximately 12 million <br />cubic yards of spoil on a reclaimed area of the Section 16 Pit (TS East 1, just East of <br />the East Taylor Fill). Colowyo has not provided any text or detail regarding whether <br />or not this stockpile would still be used, although it does not appear on the new Map <br />45. Please explain the plans for this temporary overburden stockpile and <br />update the appropriate text in Section 2.0.5.3(6) of Rule 2, Volume 12 and Maps <br />35A and 40A. <br />Response: The temporary overburden stockpile currently shown on the reclaimed <br />area of the Section 16 pit will not be built. For example, this temporary stockpile is <br />shown on the approved version of Map 23A. The spoil pile configuration shown on
The URL can be used to link to this page
Your browser does not support the video tag.