My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-08_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-12-08_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:31 PM
Creation date
12/8/2009 2:10:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
12/8/2009
Doc Name
Comments & Responses Response to DRMS Incompleteness Letter
From
Colowyo Coal Company
To
DRMS
Type & Sequence
TR81
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additional geological modeling and mine engineering has been done since PR-02 <br />was permitted. With more reliance on truck/shovel operations, additional temporary <br />fill volumes are also needed to support the planned pit dimensions. Following is a <br />comparison between the approved, PR-02 plan for temporary and permanent fill <br />volumes relative to volumes proposed under TR-81: <br />Permanent Fill Volumes PR-02 <br />West Taylor Fill 49, 934, 000 <br />East Taylor Fill 20, 409, 000 <br />Total 70, 343, 000 <br />Temporary Fill Volumes <br />Section 16 Fill 0 <br />West Taylor Fill 6,091,000 <br />East Taylor Fill 46, 213, 000 <br />Total 52, 304, 000 <br />Rule 2.10 - Maps and Miscellaneous <br />TR-81 <br />10, 000, 000 <br />50, 000, 000 <br />60, 000, 000 <br />11, 969, 000 <br />11, 969, 000 <br />2. On new Map 45 - South Taylor Fill, there is no "proposed post-mining <br />topography line on cross-section D-D'. Please add this information and resubmit <br />Map 45. <br />Response: There are no changes between the two surfaces along this cross- <br />section; both the "Postmining Topography prior to TR-81" and the proposed changes <br />to the surface are identical. A note has been added to Cross-section D-D' to clarify <br />this. <br />3. On new Map 45 - South Taylor Fill, Colowyo has several different topography <br />lines drawn on the cross-sections. These lines include "pre-mine topo", "approved <br />topo" and "proposed topo". While these lines are all useful for evaluating the <br />proposed post-mining topography and the proposed changes to the currently <br />approved post-mining topography, the labels will be confusing upon final approval of <br />the revision (when the "proposed topo" becomes the "approved topo" and the <br />"approved topo" is a historic "approved topo"). Colowyo may want to rethink the <br />labeling of Map 45 or plan to resubmit the map with different labels once all <br />technical adequacy issues have been addressed. <br />Response: The requested changes have been made. Both surfaces are still <br />displayed because we feel they are useful in understanding to changes proposed. <br />As discussed with Jim Stark, the older, approved postmining topography is labeled <br />as the "Postmining Surface Prior to TR-81 ". The newer surface is labeled as the <br />"Postmining Surface".
The URL can be used to link to this page
Your browser does not support the video tag.