My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-03_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-12-03_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:26 PM
Creation date
12/8/2009 2:09:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
12/3/2009
Doc Name
Amend Mine Plan Complete Submittal
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
TR65
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision No. 65 <br />Bond Credit Calculation <br />TR-52 Direct Cost Direct Cost Credit <br /> Task 271 Plug & Seal 13 GVBs $ 94,767 <br /> 6 of 13 Holes Not Drilled <br /> 9575' of 22660 Feet Not Drilled $ 40,044 <br /> <br /> Task 272 R rade Drill Pads 29377 <br /> 4 of 13 Drill ads not constructed $ 9,039 <br /> <br /> Task 273 R rade Light Use Roads 35680 <br /> 0.7 of 2.7 Miles not constructed $ 9,250 <br /> <br /> <br /> Task 274 Replace Topsoil to Drill Pads 13326 <br /> 4 of 13 Drill ads not constructed $ 4,100 <br /> <br /> Task 275 Replace topsoil to light use roads 15450 <br /> 0.7 of 2.7 Miles not constructed $ 4,006 <br /> <br /> Task 276 Reseed drill ads 18627 <br /> 4 of 13 Drill ads not constructed $ 5,731 <br /> <br /> Task 277 Reseed light use roads 18586 <br /> 0.7 of 2.7 Miles not constructed $ 4,819 <br /> <br /> Total Direct Cost Credit $ 76,989 <br /> Burden 28.20% $ 21,711 <br /> Total TR-52 Credit $ 98,700 <br /> <br />MR-104 <br /> Did not construct road or drill ad <br /> Did not implement MR-104 <br /> Total MR-104 Credit $ 22,486 <br /> <br /> <br />MR-106 Task 331 Plug & Seal Four GVBs $ 26,541 <br /> 3220 of 6550 not drilled $ 13,048 <br /> <br /> Total Direct Cost Credit $ 13,048 <br /> Burden 25.40% $ 3,314 <br /> Total MR-106 Credit $ 16,362 <br /> <br /> <br /> Total TR-65 Credit $ 137,548 <br /> <br /> <br />Seal Geotech Hole <br /> Fill Hole with Cement 28 bas $8.80 $ 246 <br /> 700 Feet Dee 3.8" Diameter <br /> Cut Casing at Surface 1.6 Feet 8.18 $ 13 <br /> Borehole Marker $ 2 <br /> Drill Rig Time 4 hours 191.60 $ 766 <br /> Water Truck Time 4 hours 56.94 $ 228 <br /> <br /> Total Direct Cost $ 1,255 <br /> Burden 25% $ 314 <br /> Total TR-65 Geotech Hole $ 1,569 <br /> <br /> Net TR-65 Credit $ 135,979
The URL can be used to link to this page
Your browser does not support the video tag.