My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-03_REVISION - C1996083 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2009-12-03_REVISION - C1996083 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:26 PM
Creation date
12/8/2009 2:09:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
12/3/2009
Doc Name
Amend Mine Plan Complete Submittal
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
TR65
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />6.2 Recommendations <br />This study has shown that it is possible to develop a set of mains under Terror Creek <br />without significantly impacting the stability of overburden rocks. The study also <br />identified changes in depositional environment to the west where some reduction in RQD <br />and in seam thickness is seen. <br />The following geotechnical activities are recommended for verifying the assumptions of <br />these analyses and for development of detailed designs: <br />• Additional drilling and core testing to determine triaxial strength properties of the <br />Upper B Seam. <br />is • Measurement of the far-field stress regime, preferably using a downhole <br />overcoring method. <br />• Design of prudent excavation and support techniques, including cut depth, entry <br />shape, support designs, timing of support installation, groundwater control, etc. <br />• Geotechnical monitoring of near-seam strata during development of the mains for <br />monitoring stability and support effectiveness. <br />• Monitoring overburden response during mining by analyzing results from TDR <br />measurements. <br />• Prudent longwall layout designs in the vicinity of the corridor. <br />C <br />Maleki Technologies, Inc. Page 36
The URL can be used to link to this page
Your browser does not support the video tag.