My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-11-30_INSPECTION - M1999025
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1999025
>
2009-11-30_INSPECTION - M1999025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:16 PM
Creation date
12/8/2009 8:50:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999025
IBM Index Class Name
INSPECTION
Doc Date
11/30/2009
Doc Name
Inspection report
From
DRMS
To
Grand Junction Pipe & Supply Co.
Inspection Date
11/23/2009
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Page 4) <br />MINE ID # OR PROSPECTING ID #: M-1999-025 <br />INSPECTION DATE: 11/23/2009 INSPECTOR'S INITIALS THM <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified during this <br />inspection. The problems should be corrected by the dates given, or they will become possible violations. The possible <br />violations should be corrected by the dates given to reduce their severity when considered by the Mined Land <br />Reclamation Board. The inspector noted on the previous page should be notified of all corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />CORRECTION <br />DATE <br />1. The slopes otthe topsoil stockpile were steeper than the required 3H:1 V. 12/30/2009 <br />CORRECTIVE ACTION: The topsoil must be re-configured with slopes no steeper than 3H:1 V <br />and if the stockpile is to remain at this location through the next =wing season it must be <br />seemed with an a1212r o. ed seed mix or other effective method no later than December 30 2009. <br />Please provide this office with photo-documentation that shows that the topsoil stockpile <br />meets the requirements of Rule 3-1.9. <br />PB or PV: PR <br />TOPIC(S): TS_ <br /> <br />PB or PV: <br />TOPIC(S): <br />I, Travis Marshall, hereby certify that on November 30, 2009, 1 deposited a true and complete copy of this foregoing <br />inspection report in the United States Mail, first class postage paid, to the operator of record for this site at the address <br />indicated, and to those others within the body of this report who have been designated to receive copies (D S <br />personnel excepted). <br />Signature
The URL can be used to link to this page
Your browser does not support the video tag.