Laserfiche WebLink
RnADARLE FOUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 15K GVW $44.65 1 $44.65 $44.65 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $44.65 $44.65 <br />........................ <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Carbondale <br />Transportation Cycle Time : Non- Total one-way travel distance : 25.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.71 0.71 Total non-roadable mob/demob cost $1,006.31 <br />Return time (hours) = 0.71 0.71 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost "' : $63.79 <br />Unloading time (hours) = 0.50 NA one round trip, no haw rig <br />Subtotals = 2.43 1.43 <br /> <br />JOB TIME AND COST Total job time : 4.86 hours <br /> Total job cost : $1,070