Laserfiche WebLink
ROADABLE EQUIPMENT <br />sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Fuel Tanker, 6x4, 210 HP $79.88 1 $79.88 $79.88 <br />-tube Truck, 6x4, 210 HP $95.16 1 $95.16 $95.16 <br />-Flatbed Truck, 6x4, 45K GVW $103.01 1 $103.01 $103.01 <br />-Light Duty Pickup, 4x4, 1 T. Crew $56.76 1 $56.76 $56.76 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $334.81 $334.81 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Hayden <br />Transportation Cycle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.29 0.29 Total non-roadable mob/demob cost $9,113.42 <br />Return time (hours) = 0.29 0.29 ' two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost'" : $191.32 <br />Unloading time (hours) = 0.50 NA „ one round trip, no haul rig <br />Subtotals = 1.57 0.57 <br />JOB TIME AND COST <br />Total job time : 3.14 hours <br />Total job cost : 9,305