My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-04_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-12-04_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:28 PM
Creation date
12/7/2009 10:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
12/4/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL2
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 04-Dec-09 Permit C-1994-082 Site: Yoast Mine <br />User: JRS State : Colorado <br /> Filename: C082-00f County: Routt <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Partial Phase I Bond Release SL-02 <br /> Topsoil Replacement Tasks - Tasks 040-055 <br /> <br />Task Task Description Status TASK HOURS DIRECT COST <br /> <br />040 Replace Topsoil from Stockpile "A" to Pond 010 21.21 $28,889 <br />041 Replace Topsoil from Stockpile "B" to Shop Area 16.22 $22,090 <br />042 Replace Topsoil from Stockpile "C" to Haul Road "B" 20.35 $27,718 <br />043 Replace Topsoil from Stockpile "H" to Wadge Pit 57.41 $78,198 <br />044 Replace Topsoil from Stockpile "I" to Wadge Pit 58.05 $79,071 <br />045 Replace Topsoil from Stockpile "K" to Wadge Pit 77.26 $105,244 <br />046 Replace Topsoil from Stockpile "L" to Wadge Pit 81.28 $110,720 <br />047 Replace Topsoil from Stockpile "M" to Wadge Pit 120.07 $163,552 <br />048 Replace Topsoil from Stockpile "O" to Wadge Pit 128.20 $174,630 <br />049 Replace Topsoil from Stockpile "P" to Wadge Pit 99.26 $135,213 <br />050 Replace Topsoil from Stockpile "Q" to Wadge Pit 137.47 $187,260 <br />051 Replace Topsoil from Stockpile "R" to Wadge Pit 150.63 $205,180 <br />052 Replace Topsoil from Stockpile to Drill Pads from Minor Revision 18 0.77 $653 <br />053 Replace Topsoil from Stockpile to Access Road to Drill Pad #2 from MR-18 0.29 $248 <br />054 - - - Replace Topsoilfrom Stockpile to Temporary Access Road-to-Pond 010 --- - - - - - - - -- - -- - - - - - - - ---- 0.29 -$245--- <br />055 Replace Topsoil from Stockpile "M" to Additional Disturbance from TR-21 14.31 $19,493 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 983.07 $1,338,404 <br />jrs Page 6 04-12-09
The URL can be used to link to this page
Your browser does not support the video tag.