Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BOREHOLE SEALING WORK <br />PROJECT IDENTIFICATION <br />Task #: 060 State : Colorado <br />Date : 1210312009 County :Routt <br />User : JRS Site : Yoast Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Partial Phase I Bond Release SL-02 <br />Task description : Seal All Monitoring Wells and Exploration Holes <br />UNIT COSTS Eauioment cost data source : . NA <br />Permit/job #: C-1994-082 <br />Abbreviation :none <br />Filename :C082-060 <br />Shift basis : 1 Der day <br />BOREHOLE DESCRIPTION SEALING ITEM / METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />Seal All 2" Wells (16) <br />-Bottom Plug PVC plug - 2 in. 2" NA 16.00 EA $29.03 $464.48 <br />-Fill Holes with Cement Portland cement grout 2" 860 LF 7.00 bag $10.65 $74.55 <br />-Cut Casing at Surface Exp. casing removal, 2-4 in. 2" NA 16.00 LF $2.33 $37.29 <br />-Borehole Marker Borehole marker NA NA 16.00 EA $3.72 $59.52 <br />-Drill Rig Time ATLAS COPCO ROC D3-01, 3. NA NA 32.00 HR $144.49 $4,623.71 <br />-Water Truck Time Water Tanker, 5,000 Gal. NA NA 32.00 HR $96.58 $3,090.44 <br /> <br />Seal All 4" Wells (43) <br />-Bottom Plug PVC plug - 4 in. 4" NA 43.00 EA $61.37 $2,639.03 <br />-Fill Holes with Cement Portland cement grout 4" 5,260 LF 159.00 bag $10.65 $1,693.35 <br />-Cut Casing at Surface Exp. casing removal, 4-8 in. 4" NA 43.00 LF $5.71 $245.35 <br />-Borehole Marker Borehole marker NA NA 43.00 EA $3.72 $159.96 <br />-Drill Rig Time ATLAS COPCO ROC D3-01, 3. NA NA 172.00 HR $144.49 $24,852.46 <br />-Water Truck Time Water Tanker, 5,000 Gal. NA NA 172.00 HR $96.58 $16,611.11 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Total Cost : $54,551