My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-04_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-12-04_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:28 PM
Creation date
12/7/2009 10:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
12/4/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL2
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Material weight : 2,100 pounds/LCY <br />Material description <br />Earth - Loam <br />Rated payload : 75,000 pounds <br />Payload capacity : 35.71 LCY <br />sheet 2 of 2 <br />Scraper Bowl (volume) Basis : <br />Struck volume : 24.00 LCY <br />Heaped volume : 34.00 LCY <br />Average volume : 29.00 LCY <br />Adjusted capacity : 29.00 LCY <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 7,800 <br />Scraper loading time " : 1.00 minutes <br />Maneuver and spread time : 0.60 minutes <br />load time per scraper pair on push-pull models <br /> Scraper Push dozer Source <br />Altitude adj.: 0.980 NA (Cat HB) <br />Job efficiency : 0.830 NA (Cat HB) <br />Net correction : a 813 NA <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 Z000 -4.00 5.00 1.00 2952 0.87 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.87 minutes <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return <br />Unadjusted unit production/hour : 935.39 LCY/hour * * Adjusted for job conditions <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers <br />Adjusted single scraper team (unit) hourly production <br />Adjusted multiple scraper team (fleet) hourly production <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) <br />Unit cost : $0.895 /LCY <br />Total job time <br />Total job cos <br />1.25 minutes <br />3.72 minutes <br />: 760.85 LCY/hour <br />: 2 scraper(s) <br />760.85 LCY/hour <br />1,521.70 LCY/hour <br />: 150.63 Hours <br />: $205,180 s <br />s <br />e <br />t
The URL can be used to link to this page
Your browser does not support the video tag.