Laserfiche WebLink
CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 041 State : Colorado Permit/job # : C-1994-082 <br />Date : 1210312009 County : Routt Abbreviation : none <br />User : JRS Site : Yoast Mine Filename : C082-041 <br />Permit or other job action : Partial Phase l Bond Release SI-02 <br />Task description :Replace Topsoil from Stockpile b to Shop Area <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Equipment Description <br />Scraper work team -Scraper :I Cat 637G w/push pull <br />-Push dozer:NA <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : CAT 14H <br />-Water truck : Water Tanker, 5,000 Gal. <br />Cost Bre <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 50 50 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownerhip cost/hour : $109.89 NA NA NA $41.79 $24.58 <br />Operating cost/hour : $163.34 NA NA NA $23.13 $16.65 <br />Ripper op. cost/hour : NA NA NA NA $0.00 $0.00 <br />Operator cost/hour : $24.98 NA NA NA $24.50 $38.70 <br />Unit subtotals : $298.21 NA NA NA $89.41 $79.93 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,192.85 Support: $0.00 Maintenance : $169.34 <br />j <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 25,451 CCY factor <br />Source of quantity take-off :Page 25-1-11 <br />Source of estimated swell factor : CAT Handbook <br />Total work team cost/hour : 51.362.19 <br />sheet 1 of 2 <br />Loose <br />1.115 volume : 28,378 LCY