Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 037 <br />Date : 1210312009 <br />User : JRS <br />State : Colorado <br />County :Routt <br />Site : Yoast Mine <br />Permit/job# : C-1994-082 <br />Abbreviation :none <br />Filename : C082-037 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-02 <br />Task description :Backrill and Regrade Pond 012A <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 :BOPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br />Operating cost/hour : $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : $201.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 9,920 CCY factor : 1.165 volume : 11,557 LCY <br /> <br />Source of estimated volume: Exhibit 13-12.7,• Division Estimate <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 175 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 805.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 0.88 (Cat HB) <br />Average push gradient : 6.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7,250 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2900 Ibs/LCY Net correction : 0.31 <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 252.00 LCY/hr <br /> Adjusted fleet production : 252.00 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 45.86 Hours <br />Unit cost : $0.800 /LCY Total job cost : $9,245