My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-04_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-12-04_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:28 PM
Creation date
12/7/2009 10:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
12/4/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL2
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 032 <br />Date : 1210312009 <br />User : JRS <br />Agency or organization name : Colorado Division of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase I Bond Release SL-02 <br />Task description :Backfill and Regrade Pond 012 <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br />Operating cost/hour : $95.29 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $201.60 Total fleet cost/hour : $201.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 26,729 CCY factor : 1.165 volume : 31,139 LCY <br />Source of estimated volume: Page 25-1-23 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> Operator skill <br />Average push distance : 150 feet Material consistency <br />j Unadjusted hourly production : 910.5 LCY/hr Dozing method <br /> Visibility: <br />Material consistency description : Job efficiency <br />Compacted fill or embankment Spoil pile : <br /> Push gradient <br />Average push gradient:- 0.00 % (pos) Altitude <br />Average site altitude : 7,250 feet Material weight : <br /> Blade type <br />Material weight : 2,900 Ibs/LCY Net correction <br />Weight description <br />Decomposed rock - 50% Rock, 50% EartJOB TIME AND COST <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.79 <br />1.00 <br />0.36 <br />h Adjusted unit production <br />Adjusted fleet production <br />323.54 <br />323.54 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day <br />(fnd-rf) <br />(Cat HB) <br />(Cat HB) <br />(Cat HB) <br />(S/SU/U) <br />_LCY/hr <br />LCY/hr <br />Fleet size : 1 Dozer(s) Total job time : 96.25 Hours <br />Unit cost : $0.623 /LCY Total job cost : $19,403 <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County:Routt <br />Site : Yoast Mine <br />Permit/job# : C-1994-082 <br />Abbreviation :none <br />Filename : C082-032
The URL can be used to link to this page
Your browser does not support the video tag.