Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 030 State : Colorado Permit/job# : C-1994-082 <br />Date : 1210312009 County : Routt Abbreviation :none <br />User : JRS Site : Yoast Mine Filename : C082-030 <br /> <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase / Bond Release SL-02 <br />Task description :Backfill and Regrade Pond 010 <br />HOURLY EQUIPMENT COST <br /> Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $67.77 NA <br /> Operating cost/hour : $95.29 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $201.60 Total fleet cost/hour : $201.60 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 15,000 CCY factor : 1.165 volume : 17,475 LCY <br /> <br />Source of estimate d volume: Page 25-1-23 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 150 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 910.5 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,800 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.36 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 323.54 LCY/hr <br /> Adjusted fleet production : 323.54 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 54.01 Hours <br />Unit cost : $0.623 /LCY Total job cost : $10,889