My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-04_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-12-04_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:28 PM
Creation date
12/7/2009 10:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
12/4/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL2
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />i <br />CIRCES Cost Estimatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 024 State : Colorado Permit/job# : C-1994-082 <br />Date : 1210312009 County : Routt Abbreviation : none <br />User : JRS Site : Yoast Mine Filename : C082-024 <br /> <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase i Bond Release SL-02 <br />Task description : Grade Haul Road Surface Material into Fill <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D11 R - 11 U (2005) Horsepower : 850 <br />Blade type : Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $174.21 NA <br />Operating cost/hour : $209.76 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $422.51 Total fleet cost/hour : $845.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 46,111 LCY factor : NA volume : 46,111 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />i <br />Unadjusted hourly production : 2,870.3 LCY/hr <br />Material consistency description <br />Dry, non-cohesive <br />i <br />Average push gradient : <br />Average site altitude <br />I <br />Material weight:_ <br />Weight description <br />Gravel - Pitrun <br />0.00 % (F <br />7,800 feet <br />3,250 Ibs/LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 680 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/da) <br />Spoil pile : 680 (fnd-rt) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 0.93 (Cat HB) <br />Material weight : 0.71 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.26 <br />Adjusted unit production : 752.34 _LCY/hr <br />Adjusted fleet production : 1,504.69 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) Total job time <br />Unit cost : $0.562 /LCY Total job cost <br />30.64 Hours <br />$25,895
The URL can be used to link to this page
Your browser does not support the video tag.