My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-04_REVISION - C1994082
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1994082
>
2009-12-04_REVISION - C1994082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:57:28 PM
Creation date
12/7/2009 10:54:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
REVISION
Doc Date
12/4/2009
Doc Name
Reclamation Cost Estimate (Memo)
From
Jim Stark
To
Dan Mathews
Type & Sequence
SL2
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 018 <br />Date : 1210312009 <br />User : JRS <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Partial Phase / Bond Release SL-02 <br />Task description :Narrow Permanent Roads <br />i <br />HOURLY EQUIPMENT COST <br />i <br />! Basic machine : Cat D11 R - 11U (2005) <br />Horsepower : 850 <br />Blade type : Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $174.21 NA <br />Operating cost/hour : $209.76 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $422.51 Total fleet cost/hour : $845.02 <br />i <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />I <br />volume : 11,252 LCY factor : NA volume : 11,252 LCY <br />j Source of estimated volume :Page 25-1-17 <br />Source of estimated swell factor : NA <br />i <br />HOURLY PRODUCTION Jot <br />I <br />Average push distance : 75 feet <br />Unadjusted hourly production : 3,584.2 LCY/hr <br />I <br />Material consistency description <br />Compacted fill or embankment <br />i <br />Average push gradient : 3.00 % (pos) <br />Average site altitude : 7,800 feet <br />i <br />Material weight : 2,900 Ibs/LCY <br />Weight description <br />Decomposed rock - 50% Rock, 50% Earth <br />i <br />JOB TIME AND COST <br />Fleet size : 2 Dozer(s) <br />Unit cost : $0.376 /LCY <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Routt <br />Site : Yoast Mine <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />rs Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1 shift/day) <br />0.80 (fnd-rf) <br />0.95 (Cat HB) <br />0.93 (Cat HB) <br />0.79 (Cat HB) <br />1.00 (S/SU/U) <br />0.31 <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time : <br />Total job cost : <br />Permit/job# : C-1994-082 <br />Abbreviation :none <br />Filename :C082-018 <br />1123.09 LCY/hr <br />2,246.19 LCY/hr <br />5.01 Hours <br />$4,233
The URL can be used to link to this page
Your browser does not support the video tag.