Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 087 State : Colorado Permit/job #: C-1994-082 <br />Date : 1210412009 County :Routt Abbreviation :none <br />User : JRS Site : Yoast Mine Filename : C082-087 <br />Permit or other job action :Partial Phase / Bond Release SI-02 <br />Task description :Mobilize/Demobilize Equipment for Site Maintenance <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1001) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />=Cat D3G LGP - 3P 9.69 $11.79 $88.67 5 $502.31 $443.35 $0.00 <br />-Cat D7R DS Series 11- 7SU 31.25 $40.93 $117.55 5 $792.39 $587.75 $0.00 <br />-Cat 315C L 18.63 $23.87 $88.67 5 $562.69 $443.35 $0.00 <br />;CAT 14H 20.70 $41.79 $88.67 10 $1,304.57 $886.70 $2,500.00 <br />-Reveg Equipment 20.00 $86.00 $88.67 5 $873.35 $443.35 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $4,035.31 $2,804.50 $2,500.00