Laserfiche WebLink
DEMOLITION WORK December 1, 2009 <br />TASK # 008 Bear No. 3 Mine C-1981-033 <br />Phase I Release <br />STRUCTURE OR ITEM DESCRIPTION DIMENSIONS DEMOLITION DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST <br /> <br /> <br /> <br /> <br />Culvert 5 - inlet to sediment pond 18" x 50' Means 02 41 13.40 0160 50 LF $2.87 $143.50 <br />- excavation/backfill of culvert Division estimate 50 LF $0.25 $12.50 <br />Outlet pipes for treatment pond 2 - 6" x 175' Means 02 41 13.40 0100 350 LF $1.43 $500.50 <br />Inlet pipe for treatment pond 12" x 150' Means 02 41 13.40 0150 150 LF $1.92 $288.00 <br />- excavation/backfill of culvert Division estimate 150 LF $0.25 $37.50 <br />Outlet pipe for sediment pond 12" x 40' Means 02 41 13.40 0150 40 LF $1.92 $76.80 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotal $1,058.80 <br />City Cost Index = 105.7% $60.35 <br />Task Total $1,119.15 <br /> <br />