My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-01_REPORT - M1989112
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1989112
>
2009-12-01_REPORT - M1989112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 10:25:34 AM
Creation date
12/2/2009 2:12:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989112
IBM Index Class Name
REPORT
Doc Date
12/1/2009
Doc Name
Annual Fee/Report/Map
From
Moffat County
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Annual Report <br />Moffat County Road and Bridge <br />Permit No.: M-1989-112 <br />Operation Name: Refuge Pit #1 <br />Date: November 23, 2009 <br />Yes No X A map is attached? <br />Yes No X New disturbances last year? <br />Yes No X New reclamation? <br />Yes No X New changes in map necessary? <br />- ---Yes-- --No -X_ Newrnap required? (See Note #1 - w - <br />Yes No X Specific plans for new disturbance next year? (See Notes 1 & - ?- - - <br />#2) <br />Yes No X Specific plans for new reclamation next year? (See Notes #1 & <br />#2) <br />Note #1: <br />Moffat County has an average inventory of 17 active gravel pits and we have only one crusher, <br />which operates approximately seven months out of the year. Typically, we expect to have new <br />disturbance in two gravel pits (or less) and occasional reclamation activity in one. That means <br />our only activity will be stockpile reduction and minor pit-run excavation in at least 14 of our <br />gravel pits each year. No new disturbances or reclamation will have occurred during the <br />previous year and no new changes to the previous year's map are necessary. No new <br />map is required. <br />Note #2: <br />Moffat County does not routinely make annual construction, mining and reclamation plans for <br />each pit. Our gravel activity each year is determined by necessity, emergency, budget <br />restraints, and resource availability. <br />Comments: - - -- --? _ _ _ _ -- - -
The URL can be used to link to this page
Your browser does not support the video tag.