Laserfiche WebLink
-4- <br />12. Primary future (Post-mining-) land use check one): <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />13. Primary resent tams use IcnecKL one . <br />Cropland(CR) U Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/CommeIcial(IC) <br />Solid Waste Disposal(WD) <br />F General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining Briefly explain mining method (e.g. truck/shovel): <br />Excavator, Loader, Haul Trucks, Scrapers <br />15. On Site Processing —Z Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovcl): <br />Excavator, Loader, Haul Trucks, Scrapers <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />16. Description of Amendment or Conversion <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />Increasing Permit area to cover entire parcel Increase limits of excavation by - 1.2 acres <br />