My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1980007A (15)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-09-21_PERMIT FILE - C1980007A (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:38 PM
Creation date
12/2/2009 10:09:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Doc Name
Coal Preparation Plan and Associated Coal Handling Facilities
Section_Exhibit Name
Exhibit 81
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Chris Nyikos, Project Manager - Mountain Coal Company <br />Subject: Geotechnical Review of Updated PR-2 Conveyor Alignment <br />Date: July 17, 2009 <br />Project: 06/26-1004 <br />Proposed Coal Handling and Preparation Plant Facilities <br />Mountain Coal Company (MCC) is investigating the possible addition of a new Preparation Plant and coal <br />handling facilities at the West Elk Mine. As part of the investigation, MCC asked Barr to provide a <br />conceptual geotechnical review of proposed foundation locations (provided by MCC) for the Coal <br />Conveyor Corridor (PR-2), the TC-1/PR-2 Transfer Station location, and the Lower Refuse Pile (LRP) <br />Screening and Preparation Plant. <br />MCC provided the conveyor alignment and profile drawings developed by the structural design <br />engineering firm Roberts & Schaefer. The alignment positions a majority of the conveyor structure on the <br />hillside north of the access road and beyond the slope crest, and as such, poses additional stability risk. <br />MCC provided preliminary site plan and conveyor profile drawings developed for the project by Roberts & <br />Schaefer and sent limited geotechnical information for the LRP. The site plan includes a new TC-1/PR-2 <br />Transfer Station that will be fed by the existing R-1 conveyor (extension required), as well as a new TC-1 <br />conveyor with ground-load feed hopper. The TC-1/PR-2 Transfer Station will produce an 8" minus ROM <br />product for transfer to the proposed Preparation Plant, an 8" plus coal product to be returned to storage, <br />and a trash/rock by-product for disposal. The 8"minus coal will be transferred by a new PR-2 conveyor to <br />the proposed Screening and Preparation Plant location on the LRP. <br />Issues Addressed in this Review <br />The primary tasks addressed in this geotechnical review for the proposed preparation plant and coal <br />handling facilities include the following: <br />• Conveyor alignment cross-sections, slope stability modeling, and incorporating any updated <br />drilling data <br />• Stabilization requirements and associated recommendations <br />• Conceptual review for stabilization requirements associated with the proposed Preparation Plant <br />on the Lower Refuse Pile (LRP) site <br />-2-
The URL can be used to link to this page
Your browser does not support the video tag.