Laserfiche WebLink
West Elk Mine <br />Exhibits (Continued) <br />Exhibit 59 <br />SOM Water Quality up to June 1989 ............ ............................... Volume 12 <br />Exhibit 60 <br />Subsidence Evaluation for the Apache Rocks Mining Area <br />andBox Canyon Lease Tract .................... ............................... Volume 12 <br />Exhibit 60A <br />Subsidence Evaluation of the Revised Mine Panel Layouts <br />in Section 21 and Sections 26 and 27 ............................. Volume 12 <br />Exhibit 60B <br />Subsidence Evaluation for the South of Divide Mining Area.. Volume 12 <br />Exhibit 60C <br />Subsidence Evaluation in 2004 Geologic Field Observations <br />For the West Flatiron Lease Area .............. ........................Volume 12 <br />Exhibit 60D <br />Geologic Hazard Field Observations <br />For the South Divide Mining Area ............ .........................Volume 12 <br />Exhibit 61 <br />Determination of Species Diversity Standard ............................. Volume 12 <br />Exhibit 62 <br />Letter from the Colorado Division of Wildlife <br />Concerning Shrub Density Performance Standards ............. Volume 12 <br />Exhibit 63 <br />USDA Soil Conservation Service Letter Regarding <br />Alluvial Valley Floors at the West Elk Mine .......................... Volume 12 <br />Exhibit 64 <br />Excerpts from Bear Coal Company's Reclamation Plan ........... Volume 11 <br />Exhibit 65 <br />MSHA Refuse Pile Fire Fighting Plan .......... ............................... Volume 11 <br />Exhibit 66 <br />West Elk Mine Water Control Plan ............. ............................... Volume 8A <br />Exhibit 67 <br />Windy Gap Policy, North Fork of the Gunnison River <br />Depletion Calculations ......................... ......................Volume <br />Exhibit 68 <br />Major Buildings and Structures "As Built" Summary........... Volume 10A <br />Exhibit 69 <br />Sylvester Gulch Facilities Area ................... ............................... Volume 10A <br />Exhibit 70 <br />Refuse Pile Expansion (RPE) ............................. .........................Volume 10B <br />Exhibit 70A <br />RPE Construction Plan (MR303) ...................... .........................Volume 10B <br />Exhibit 70B <br />RPE Dozer Trail & Interim Topsoil Stockpile (MR356) .........Volume 10B <br />Exhibit 71 <br />Hydrologic Characterization South of Divide Area and <br />Monitoring Plan — West Elk Mine ........ .........................Volume 14 <br />Exhibit 72 <br />Preventative Measures, Geotechnical Evaluation, Seismic <br />Evaluation for Monument Dam ....... ............................... Volume 14 <br />Exhibit 73 <br />Pre - Subsidence Inventory of Lower Cow Camp ..................Volume 14 <br />Exhibit 74 <br />Monument Dam — Minnesota Reservoir Structure Inventory <br />and Miscellaneous Information ........... .........................Volume 14 <br />Exhibit 75 <br />Sylvester Gulch Road Expansion Project .. .........................Volume 14 <br />Exhibit 76 <br />Preventative Measures for Monument Dam .....................Volume 14 <br />Exhibit 77 <br />Deer Creek Shaft - BA/BE, MIS Evaluation, Cultural Survey ..Volume 6 <br />Exhibit 78 <br />Dry Fork Federal LBA (Lease COC- 67232) Final EIS.. (USFS document) <br />Exhibit 79 <br />Deer Creek Shaft Project .................... .........................Volume 11A <br />Exhibit 80 <br />Thermal Event Wells, Methane Drainage Wells, Geotechnical Boreholes, <br />and misc. approved revisions (MRs /TRs) ................Volume 11A -C <br />Exhibit 81 <br />Coal Preparation Plant & Associated Handling Facilities ...... Volume 10A <br />Rev .03/06 -PRIG; 04106- PRIO; 05/06- PRIG; 09107 - PR12; 02108 - PR12; 04109- TR117; 08109- TR118 <br />