My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1980007 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-09-21_PERMIT FILE - C1980007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:38 PM
Creation date
12/2/2009 9:49:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Section_Exhibit Name
Exhibit 51 Lower Refuse Pile
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Coal Company, L.L.C. Exhibit 51 <br />West Elk Mine ~ Lower Refuse Pile <br />• <br />•, <br /> <br />Table 9 -SedimentControl Ditch Design', 100.YearStorm <br />' Ditch triangular shaped, 2 feet deep, 3H:1 V slopes <br />= Average riprap size. Thickness of riprap average of one foot. <br />' Exhibit 66 refers to these ditches as D'_R-I for the north ditch, D2R-IA for the west ditch, D2R-2 for the southwest <br />ditch. D?R-3 for the east ditch and D2R-4 for the south ditch. The south ditch will be constructed when the pile <br />reaches the maximum height along the south edge. <br />' As calculated by Manning s equation and is represen[ativeof the velocity with such shallow flows K large diameter <br />riprap. <br />Phase Location 100-year,24-hour Peak Velocity Normal RiprapSize= <br /> Discharge(cfs) (fps) Depth(ft) (inches) <br /> North' 6.9 4.3 0.74 Unlined <br /> Easr' 4.6 4.~ 0.68 Unlined <br /> South' 2.8 4.7 0.45 Unlined <br />II North 9.0 4.7 0.80 Unlined <br /> East 4.6 4.~ O.S8 Unlined <br /> South 2.8 4.7 0.45 Unlined <br />I11 North 8.5 4.6 0.78 Unlined <br /> East 5.3 ~.8 0.» Unlined <br /> Southwest' 3.4 ~.? 0.46 Unlined <br /> West 5.3 5.5 0.~7 Unlined <br />lV North 25.53 10.8 1.~9 Shotcrete <br /> East 22.18 34.1 1.07 Shotcrete <br /> Wes[ 2.13 5.7 0.93 Unlined <br /> Southwest 2.22 253.6' 0.57 I5.0 <br /> South 2.71 3.8 I.10 Unlined <br />Subsoil Pile <br />(Phase [ -III) <br />West 0.59 1.5 '036 Unlined <br />North 0.59 5.2 0.19 Unlined <br />East 1.18 4.3 0.27 Unlined <br />Topsoil Pile <br />(Phase I -III) <br />Upper West 2.65 4.9 0.42 Unlined <br />Lower West 2.65 5.1 0.41 Unlined <br />East 2.65 5.0 0.42 Unlined <br />South 2.65 2.3 0.62 Unlined <br />The sedimentation basin storage vs. volume curve for MB-6 is shown in Figure LWP-014 in Appendix L. <br />The current sedimentation basin (MB-2R) embankment has a top elevation of approximately6l'_0 feet with <br />a pond bottom elevation of approximately 6100 feet. A 48-inch CMP drop spillwa}• pipe structure is <br />located a[ elevation 61 17.7 feet with a 8-inch drain valve located approximatelyat elevation 6103 feet. <br />?'] <br />
The URL can be used to link to this page
Your browser does not support the video tag.