Laserfiche WebLink
III III I II I IIIIII III Doc Date:12/11I2001 <br />ggg TABLE OF CONTENTS <br />l .0 INTRODUCTION .............................. _............................ _............................ _............................ _... 1 <br />•. <br />•} <br />.• <br />2.0 DESCRIPTION OF PILECONF[GURATIONANDPHASING .............................. _.......................3 <br />2.1 Current Lower Refuse Pile Configuratioa ............................._........................ ...._..............,....3 <br />2.2 Final Lower Refuse Pile Configuration(RevisedMsrch, 1996) ....................... ......._...........,....3 <br />2.3 Phasing .............................._............................_............................_............... ............._.....,.....4 <br /> 2.3.1 Phase I .............................._............................_............................_..... ......................._4 <br /> 2.3.2 Phase ll .............................._..:........................._............................_... ...........................4 <br /> 2.3.3 Phase 111 .............................._............................_............................_.. ..........................4 <br /> 2.3.4 PhaselV .............................._............................_............................_.. ...........................4 <br /> 2.3.5 Phase V .............................._............................_............................_... ..........................5 <br />2.4 StorageCapaciry .............................._............................_............................_. ..........................5 <br />2.5 Materials Balance .............................._............................_............................_ .........................b <br />2.6 HighwayRight-of-Way .............................._............................_..................... ......._.................7 <br />3.0 SOIL COVER VARIANCE .... <br />............ _ ...................8 <br />4.0 TOPSOIL AND SUBSOIL SALVAGE AND STORAGE .............................._............................_...9 <br />4.1 Topsoil and Subsoil Salvage .............................._............................_............................_...,.....9 <br />4.2 Topsoil Storage .............................._............................_............................_.......................,.....9 <br />4.3 Subsoil Storage .............................._............................_............................_.......................,.....9 <br />5.0 GEOTECHNICALSTUD[ES .............................._............................_.......................... .._..............II <br />5.1 Field Investigation .............................._............................_............................_.... ..............,....1 I <br />5.2 Laboratory Results .............................._............................_............................_... ...................12 <br />5.3 Geology .............................._............................_............................_.................... ........_........12 <br />5.4 Subsurface Hydrology .............................._............................_............................ _.................13 <br /> 5.4.1 Permeability Data .............................._............................_........................ ...._............13 <br /> 5.4.2 Leachate Data .............................._............................_............................_ ..................14 <br /> 5.4.2.1 Leachate Estimate Performed for Phases I through IV .................. ............_....14 <br /> 5.4.2.2 Leachate Estimate Performed for Phase V .............................._.... ...................16 <br /> 5.4.3 Leachate TestingResults .............................._............................._............. ..............._.16 <br /> 5.4.4 Water Quality of the North Fork of the Gunnison River ............................. ._..........,,...17 <br /> 5.4.5 Underdrains .............................._............................_............................_.. ...................18 <br />5.5 Slope Stabilirv Analysis of Phases I through 1 V .............................._.................... ........._........ 18 <br /> S.~.i Cri[icafSections ............................._............................_........................... ._...............i8 <br /> x.5.2 Parameter Selection .............................._............................._..................... ......._.........19 <br /> 5.5.3 PiezometricPressure .............................._............................._................... ........._.......20 <br /> 5.5.4 Analyses Results .............................._............................_.......................... .._.............21 <br />5.6 Slope Stability Analysis of Phase V .............................._............................_....... ...................21 <br /> 5.6.1 Critical Sections ............................._............................._........................... ._..............22 <br /> 5.6.2 Parameter Selection .............................._............................_..................... ......._....,....23 <br /> 5.6.3 AnalysesResults ..............................._............................_.......................... ..._..............24 <br />6.0 SUR FACE HYDROLOGY ..............................._............................._...........................~_ ..................25 <br />6. I Introduction ..............................._............................_............................._............. ..............._. 25 <br />6? Sediment Control Ditches .............................._............................_....................... ....._...........25 <br /> 6.2.1 Sediment Control Ditches for Phases 1 through IV .............................._.... ...................25 <br /> 6.2.2 Sediment Control Ditches for Phase V .............................._...................... ......_...........26 <br />6.3 DesignafSedimentControlPond .............................._............................_.......... ...................26 <br /> 6.3.1 Sediment Control Pond for Phases I through IV .............................._........ ..............,....26 <br />