My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1980007A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-09-21_PERMIT FILE - C1980007A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:38 PM
Creation date
12/2/2009 8:45:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />138State : Colorado Permit/job #: C-80-007 <br />01/08/2007 County : Gunnison Abbreviation :none <br />TAK Site : West Elk Mine Filename : 0007-138 <br />Permit or other job action : Permit Renewal Rn-05 <br />Task description : Replace topsoil from stockpile to fill side of light use road expansion <br />.:............................................................................................................................................................................... <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 637G w/push pull <br />-Push dozer: NA <br />Support equipment -Load area <br />-Dump area <br />Cost Bre <br />Road maintenance -Motor grader :NA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper-2 NA NA NA NA NA <br />% Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $103.51 NA NA NA NA NA <br />Operating cost/hour : $161.32 NA NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals : $289.78 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $579.56 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $579.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 833 BCY factor : 1.250 <br />Source of quantity take-off :Division estimate <br />Source of estimated swell factor : CAT Handbook <br />volume : 1,041 LCY
The URL can be used to link to this page
Your browser does not support the video tag.