My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1980007A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-09-21_PERMIT FILE - C1980007A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:38 PM
Creation date
12/2/2009 8:45:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
User : TAK Site : West Elk Mine <br />Agency or organization name : Colorado Division Of Reclamation, <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Pull <br />HOURLY EQUIPMENT COST <br />material from <br />Machine description : Cat 330C L <br />Filename :0007-136 <br />And Safety <br />Gulch Light Use Road Expansion <br />Horsepower: 244 <br />Weight (MT) : 33.72 <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $46.31 NA Shiftbasis : 1 per day <br />Operating cost/hour : $58.15 100 Data source : (CRG) <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $137.42 Total fleet cost/hour : $137.42 <br />....... ..:.......:..:........... . <br /> <br />MATERIAL QUANTITIES ...::....... <br />................................................................... <br />............................. <br />Initial Swell Loose <br />volume : 5,520 CCY factor : 1.165 volume : 6,431 LCY <br />Source of estimated volume : Division estimate <br />Source of estimated swell factor : CAT Handbook <br />..................: <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, swing loaded. dump bucket. swing empt <br />Basicjob condition description : BELOWAVERAGE <br />Secondary job condition within basic description : SEVERE <br />Cycle time value : 0.39 minutes <br />Bucket Capacity <br />Rated bucket capacity : 2.25 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 909,66) <br />Adjusted bucket capacity : 1.91 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 6,100 feet Altitude adjustment : 1.00 I (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.83 multiplier <br /> <br />Unadjusted hourly unit production : 294.23 LCY/hour <br />Adjusted hourly unit production : 244.21 LCY/hour <br />Adjusted hourly fleet production : 244.21 LCY/hour <br />JOB TIME AND COST <br />Fleet size excavator(s) Total job time : 26.33 hours <br />Unit cost : $0.563 per LCY Total job cost : $3,619 <br />
The URL can be used to link to this page
Your browser does not support the video tag.