My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-21_PERMIT FILE - C1980007A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2009-09-21_PERMIT FILE - C1980007A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:55:38 PM
Creation date
12/2/2009 8:45:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
9/21/2009
Section_Exhibit Name
Exhibit 53 Reclamation Cost Estimate Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COMPACTION WORK <br />Agency or organization name : Colorado Division Of Reclamation, Mining And <br />Permit or other job action : Permit Renewal RN-05 <br />Task description : Compact backfilled material at Shaft #3 Pad and roads <br />::.....:................ ............................. .......................................... ........... ........ ...... <br />:......:.....:..... ....... <br />HOURLY EQUIPMENT COST <br />Machine description : CAT 825G Series 11(2005) Horsepower : 339 <br />Compactor type : Soil - tamping foot Shift basis : 1 per day <br />volume : 200,830 LCY <br />factor : 0.875 volume <br />Source of estimated volume : ODerator estimate <br />175,726 CCY <br />Source of estimated shrinkage factor :CAT Handbook <br />::...........::................................................................................................................ <br />HOURLY PRODUCTION <br />Unadiusted hourlv production = (W x S x L x C) / P <br />Compacted width per pass (W) <br />Average compactor speed (S) <br />Compacted thickness of each lift (L) <br />Conversion constant (C) <br />Required number of machine passes (P) <br />Unadjusted hourly unit production <br />Job Condition Correction Factors <br />Site altitude : 7,100 feet <br />8.67 feet <br />4.00 mph <br />12.00 inches <br />16.3 (5,280 ft./12 in./27 cu.ft.) <br />5 passes <br />1.356.68 CCY/hr <br />Source <br />Altitude adjustment factor : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />Adjusted hourly unit production : 1,126.05 CCY/hr <br />Adjusted hourly fleet production : 1,126.05 CCY/hr <br />::::::::.....::::::::::::::::::.:::.::::::::::::::.:::::::::::.::::::::.:.::::::::::::::.:::::::::::::.::::::::::::::.::::..:.........................................................:................................................................... <br />JOB TIME AND COST <br />Fleet size : 1 compactor(s) Total job time : 156.06 hours <br />Unit cost $0.152 per CCY Total job cost : $26,670 <br />xxxx'
The URL can be used to link to this page
Your browser does not support the video tag.